About QMC » Our Stories »
In 2005, the refurbishment of the Tower Block began: every plaster moulding was removed copied and replaced and the building was strengthened, rewired and the kauri brought back to its original golden brilliance. The Tower graffiti was carefully photographed before it underwent its makeover.